Picked up a power flow setup that was intended for an x300 for a killer price that I couldn’t pass up, so on the 210 it goes! This will be the documentation of my certainly -harder than it should have been- adaptation. My plan is to use the metal stock that I’ve got on hand.
The initial holding down of the bagger and
1.5” square tubing cut and drilled to match the existing holes in the back hitch plate. I left it a little wide just in case I needed to modify something.
I was tired of searching for random bolt sizes so I ran to Blowe’s real quick to pick up a case, random grade 5 bolts in 3/8-16 size, along with washers and nuts. This was the most expensive part of the whole thing
The initial holding down of the bagger and
1.5” square tubing cut and drilled to match the existing holes in the back hitch plate. I left it a little wide just in case I needed to modify something.
I was tired of searching for random bolt sizes so I ran to Blowe’s real quick to pick up a case, random grade 5 bolts in 3/8-16 size, along with washers and nuts. This was the most expensive part of the whole thing