Joined
·
710 Posts
I have installed a hydrolift on my b110 and now I need to reconnect the side PTO.
The PTO bracket has two holes for allowing it to be attached to the side of the frame but the holes don't line up with any existing holes in the frame.
Do I need to drill some new holes ? If so, where do they go ?
Does anybody have a picture of how this is set up on their machine ?
The PTO bracket has two holes for allowing it to be attached to the side of the frame but the holes don't line up with any existing holes in the frame.
Do I need to drill some new holes ? If so, where do they go ?
Does anybody have a picture of how this is set up on their machine ?