Good point, somethings running the FEL. shouldn't be too hard to add another port for log splitter operation.well if it has a pump on the front he could just have one of the lines quick disconnect run it to the log splitter then use like say the dump cylinders hydraulics to run the log splitter when done splitting logs quick disconnect back and away u go