Joined
·
725 Posts
Now that I have the plow done on the Massey it is time for making mounts for the Craftsman and AMF blower. I have to raise the winch for clearance so I am adding about 4" of steel to raise it up. Not sure if I want to 4-link or 2-link the arms for the blower yet. If I do 4 then I can keep it level or if I do 2 then it will just raise like a snowplow. I know a lot of manufactures run 4-link to keep it level. Any thoughts???
Attachments
-
127.5 KB Views: 75
-
128.9 KB Views: 69