Advice needed on the most versatile machine for me

6224 Views 14 Replies 10 Participants Last post by  JB222
So after a few months hanging out in the Lawn and Garden section I am starting to think about a CUT for some of my Spring projects. I am going to try and describe my intended use and experience as well as I can. Hopefully you all will have some recommendations to point me in the right direction.

I am a General Contractor doing Residential additions, remodeling, repairs, and some new construction. For years I have rented either a mini-ex or skid steer whenever needed for the job. However now that I am getting into tractor in general and some larger scale projects I am thinking a CUT loader backhoe might be the best machine for me.

One reason I am leaning toward the CUT is the versatility of the rear hitch and/or a quick disconnect on the loader. This way I can rent or down the line purchase attachments for post holes, seeding, soil prep etc. as I go. I would like to keep the machine plus trailer weight below 10k for easy towing. I think 4wd would be very helpful as I tend to get myself into "those spots" very often. Also I would like the machine to be used and less the 10k in price.

Being that I have been enjoying nothing but Case garden tractors I was originally looking into a Case 7020 LBH. I really like the set up of these machines and have gotten very comfortable with working on them. However I am not sure the 7020 will be big enough for some of my tasks. The biggest project I have in mind for this spring will be the site work associated with a 30x30 addition with a 4 foot deep crawlspace for the foundation. This would also include some trenching and digging for the septic and utilities. Anything bigger than this and I would still hire an excavator for the work.

Thanks in advance for the input and advice. If you need any other info on my plans please don't hesitate to ask.
See less See more
1 - 1 of 15 Posts
"rent an excavator when you need to dig"

... or a contractor who has the experience and can dig that hole more quickly and possibly more cheaply considering the cost of rental time, hauling, etc.

That 30X30X4 hole is about +130 cubic yards of material- a lot of material to move with a SCUT especially if your soil is rocky. My driveway project required a contractor to move ~175 yards and 180 yards fill. There is no way my CUT could have moved some of the boulders out of the driveway's subsurface. One needed both a mini excavator and an industrial TLB to move. I have had no problems moving that 175 yards (minus boulders) ;).
See less See more