or at least 10% of them. I still have a really big 90% to go. this is the walkway and part of the front patio. me and a helper for 2 days. He worked 6 hours each day and I worked 10. We also had to remove the 280 square feet of old pavers.
I didn't have a fork lift for this small section so I made a cart out of my zero turn mower. worked super good. let me bring the pavers from 200 feet away right to where I needed them. I actually had 2. the other was a little smaller so while I was putting them down he was getting more.
the other thing is my RAS stone cutter. Just an old craftsman with a mason blade and a concrete saw water kit attached. I have used a number of different wet saws in the past and this was the best. I could shave a straight blade with off.
I didn't have a fork lift for this small section so I made a cart out of my zero turn mower. worked super good. let me bring the pavers from 200 feet away right to where I needed them. I actually had 2. the other was a little smaller so while I was putting them down he was getting more.
the other thing is my RAS stone cutter. Just an old craftsman with a mason blade and a concrete saw water kit attached. I have used a number of different wet saws in the past and this was the best. I could shave a straight blade with off.